Opening of Meeting with Roll Call
Approval of Minutes of Previous Meeting(s)
Hearings on Certificates of Appropriateness: Hearings: Introduction, Swearing-In, Summary of Process - Introduction of Hearings and Rules of Procedure - Swearing-In of Speakers - Summary of the Hearing Process
419 Metcalf St. – to include installation and screening of a mechanical unit in the Primary AVC.
1229 National Ave. - to include construction of a carport and a gravel driveway in the Secondary and Tertiary AVCs.
1223 National Ave – to include revising the approved plans for an addition, changing the roof configuration, in the Tertiary AVC.
413 George St. – to include a new covered and screened deck and other modifications in the Secondary and Tertiary AVCs.
F. 801 E. Front St. – to include a new design for construction of a new infill house. G. 815 E. Front St. – to include construction of a new infill house. H. 811 E. Front St. – to include construction of a new infill house.
New Business Committee Requests for HPC Action Proposal by Guidelines Updates Committee – change Minor Works list
Proposal by Prevention of Demolition By Neglect Committee – revise PDBN list
Create new Historic Owners’ Support Committee
7. HPC Administrator’s Report A. Report on CoAs Issued Since the Day Before the Prior Regular Meeting (8/18/20 - 9/4/20) MAJORS: 220–226 Craven St. – demo addition, new gravel parking, exterior doors, removal of overhead door, close opening with concrete block, and paint block to match 315A Pollock St. – new aluminum clad back balcony windows and doors 1223 National Ave. – remove deck, move hvac unit, construct new addition, new screened-in porch, and new wood deck, railing, and steps. 501 Craven St. – new addition to the existing garage, add covered side porch to the house 304 Queen St. – construction of a new infill house 801 E. Front St. – construction of a new infill house 417 Broad St. – construction of a new accessory building 508 Middle St. – construction of a new accessory building MINORS: 507 E. Front St. ROW – tree replacement 411 E. Front St. ROW – tree replacement 305 Bern St. ROW – tree replacement 209 Pollock St. ROW – tree replacement 724 Pollock St. – tree replacement 402 S. Front St. (Elec. Dept.) – tree replacement 412 S. Front St. (Elec. Dept.) – 2 trees replacement 411 Craven St. (Courthouse Annex) – mechanical work 521 E. Front St. – mechanical unit 1117 N Craven St. – mechanical unit B. Report on CoA Extensions Issued Since Prior Regular Meeting: 416-418 Broad St. - Extension until September 25, 2021, of the CoA approved September 25, 2019 - to include infill construction of 8 new townhouse units in 2 new 3-story buildings; parking and internal garages to be located and accessed from the rear of the buildings with the following condition: submit a landscape plan to the Historic Preservation Administrator for review and approval. 501 Metcalf St. – Extension until October 16, 2021, of the CoA approved October 16, 2019 - landscaping in front along Metcalf, add gate along New St., and new driveway and parking area behind the house with the following conditions: All on-site parking spaces are moved to the parking area at the rear of the house. C. SHPO Training – HPC group viewing recent and future i. Comprehensive Community Preservation D. Other Items and Updates i. King Solomon Lodge grant award by the State - $15,000 award of Federal funds for a consultant to produce a historic preservation plan. ii. Resiliency Plan – report on second meeting for the plan 9. Adjournment
Opening of Meeting with Roll Call
Approval of Minutes of Previous Meeting(s)
Hearings on Certificates of Appropriateness: Hearings: Introduction, Swearing-In, Summary of Process - Introduction of Hearings and Rules of Procedure - Swearing-In of Speakers - Summary of the Hearing Process
419 Metcalf St. – to include installation and screening of a mechanical unit in the Primary AVC.
1229 National Ave. - to include construction of a carport and a gravel driveway in the Secondary and Tertiary AVCs.
1223 National Ave – to include revising the approved plans for an addition, changing the roof configuration, in the Tertiary AVC.
413 George St. – to include a new covered and screened deck and other modifications in the Secondary and Tertiary AVCs.
F. 801 E. Front St. – to include a new design for construction of a new infill house. G. 815 E. Front St. – to include construction of a new infill house. H. 811 E. Front St. – to include construction of a new infill house.
New Business Committee Requests for HPC Action Proposal by Guidelines Updates Committee – change Minor Works list
Proposal by Prevention of Demolition By Neglect Committee – revise PDBN list
Create new Historic Owners’ Support Committee
7. HPC Administrator’s Report A. Report on CoAs Issued Since the Day Before the Prior Regular Meeting (8/18/20 - 9/4/20) MAJORS: 220–226 Craven St. – demo addition, new gravel parking, exterior doors, removal of overhead door, close opening with concrete block, and paint block to match 315A Pollock St. – new aluminum clad back balcony windows and doors 1223 National Ave. – remove deck, move hvac unit, construct new addition, new screened-in porch, and new wood deck, railing, and steps. 501 Craven St. – new addition to the existing garage, add covered side porch to the house 304 Queen St. – construction of a new infill house 801 E. Front St. – construction of a new infill house 417 Broad St. – construction of a new accessory building 508 Middle St. – construction of a new accessory building MINORS: 507 E. Front St. ROW – tree replacement 411 E. Front St. ROW – tree replacement 305 Bern St. ROW – tree replacement 209 Pollock St. ROW – tree replacement 724 Pollock St. – tree replacement 402 S. Front St. (Elec. Dept.) – tree replacement 412 S. Front St. (Elec. Dept.) – 2 trees replacement 411 Craven St. (Courthouse Annex) – mechanical work 521 E. Front St. – mechanical unit 1117 N Craven St. – mechanical unit B. Report on CoA Extensions Issued Since Prior Regular Meeting: 416-418 Broad St. - Extension until September 25, 2021, of the CoA approved September 25, 2019 - to include infill construction of 8 new townhouse units in 2 new 3-story buildings; parking and internal garages to be located and accessed from the rear of the buildings with the following condition: submit a landscape plan to the Historic Preservation Administrator for review and approval. 501 Metcalf St. – Extension until October 16, 2021, of the CoA approved October 16, 2019 - landscaping in front along Metcalf, add gate along New St., and new driveway and parking area behind the house with the following conditions: All on-site parking spaces are moved to the parking area at the rear of the house. C. SHPO Training – HPC group viewing recent and future i. Comprehensive Community Preservation D. Other Items and Updates i. King Solomon Lodge grant award by the State - $15,000 award of Federal funds for a consultant to produce a historic preservation plan. ii. Resiliency Plan – report on second meeting for the plan 9. Adjournment